Projects

Some sample projects we have completed:

Imperial Hotel-installation of 82 air conditioning unit

Supermacs-installation of large dough room, air conditioning and ventilation system at their new production facility at Ballybrit.

VEC-installation of gas driven air conditioning unit in their new 8000ft facility.

MJII meats-large industrial installation of refrigerated cold and freezer rooms.

Connemara smokehouse-installation of blast freezer

Creganna-installation of Dakin VRF air conditioning and heat recovery system.

Transitions optical-installation of fan coil units, Mitsubishi electric air conditioning and ventilation.

Danny Flaherty, Renvyle –installation of air to water heat pump complete with under floor heating,300lt stainless steel cylinder and controls. self build ,1980ft

Paul Heanue, tully-installation of air to water heat pump, under floor heating,300lt stainless steel cylinder, brink heat recovery system, air conditioning and domestic plumbing. 3100ft (builder)

Cathal Furey, Oranmore, Galway.-installation of air to water heat pump ,under floor heating,300lt stainless steel cylinder and domestic plumbing. engineer  3000ft

Tom Delaney, Athlone-installation of air to water heat pump,underfloor heating,300lt stainless steel cylinder and brink heat recovery.  Builder 3400ft

Ray Mc Sharry, Roscommon-installation of two air to water heat pump,underfloor heating,500lt stainless steel cylinder and advanced controller.self build 7200ft

Michael Ryan ,Limerick-installation of air to water heat pump,underfloor heating,stainless steel cylinder and brink heat recovery ventilation.selfbuild 2200ft

Jack Roland, Crossmolina-installation of air to water heat pump,underfloor heating,stainless steel cylinder and heat recovery ventilation.builder 2860ft

Gerard Flanagan, Ballyvaughin-installation of air  to water heat pump,radiators,400lt stainless steel cylinder and domestic plumbing.self build 2100ft

Cathal Walsh, Clifden-installation of air to water heat pump,underfloor and radiators,300lt stainless steel cylinder and brink heat recovery system. self build 3800ft

Shane Joyce, Clifden-installation of air to water heat pump to existing underfloor heating previously ran of gas.engineer 6000ft